Project name | Sydney Harbour Bridge Rail Deck Upgrade |
---|---|
Client | Transport for NSW |
Location | New South Wales |
Right on track: heavy-duty grout for iconic bridge rail deck
Client needs + challenges
- Scheduled supply of large volumes.
- No delays, fast turnaround, precise delivery.
- Australian-made products and scalable production.
- High vibration resistance and strength for rail track pads.
- UV resistance for exposed track pads.
- Exceptional service at every step.
Solutions, service + simplicity
We were proud to provide the right solution and support to help our client achieve their objectives – and stay on track – to deliver this complex project.
- Once the rail height and width were set, formwork was placed around the Delkor Rail Egg Pad (a rail fastener for high vibration and noise attenuation).
- Megapoxy 206 Ultra was poured into the formwork to lock the rail system onto the concrete rail deck. 206 Ultra is a heavy-duty, flowable, 100% solids epoxy grout – designed specifically for civil engineering and structural applications where strength is imperative.
Standout benefits
- Supply and service helped keep the project right on schedule.
- Reduced deck maintenance with more robust and longer-lasting materials.
- Works estimated to extend the life of the 88-year-old railway corridor by another 120 years.
- Trains to run more quietly, smoothly and reliably.