Secrets of a record-breaking bridge

Bridgewater Bridge was Tasmania’s largest infrastructure project – and every one of its 1,082 precast concrete segments is held together with Megapoxy PME SBA. Built segment by segment using a balanced cantilever method, the 1.2km structure carries over 22,000 vehicles a day.
Connect with us
From specifications to applications, we provide clear, practical advice. Take a second to send your details and we’ll be in touch.
"*" indicates required fields
Stay ahead with Megapoxy
Want free tools, industry advice, and the stories behind Australia’s toughest builds – just like Bridgewater Bridge?
Resources for engineers, contractors & builders

Free guides and tools designed to make specification and application easier.
- Civil Engineering Guide
- Concrete Repair Guide
- Flooring Guide
- Natural Stone Products Guide

Find your local distributor
Looking to source Megapoxy for your next project? Our trusted distributor network makes it simple.

50+ years of holding projects together
Chosen by the industry’s best for proven performance, practical innovation, assured quality and supply