Parramatta Light Rail

Project name Parramatta Light Rail
Contractor ANRIC Group (plant, labour and track support)
Project Owner Transport for NSW
Location Sydney, NSW
Application Grouting

 

Grouted for the journey: epoxy grout strength behind Sydney's light rail

Megapoxy 206 Ultra was used as a grout layer to secure the rail fastening system across this new 12-kilometre, two-way track featuring 16 light rail stops. With high-frequency services seven days a week, the line is designed to serve thousands of daily commuters and link major health, education and business precincts with growing local communities. By providing around 20,000 litres of high-strength epoxy grout for rail infrastructure, we delivered a durable foundation for this major piece of Sydney’s transport network.

Client needs + challenges

  • Reliable, just-in-time delivery of large volumes for continuous track installation.
  • Fast turnaround and responsive service to keep construction on schedule.
  • Locally manufactured product with scalable production for major infrastructure works.
  • Proven vibration resistance to meet strict urban noise and performance standards.
  • Durability across varied site and weather conditions.
  • Technical support and service throughout installation.

Solutions, service + simplicity

Megapoxy 206 Ultra was supplied for the DELKOR Egg Fastening System, which secures tram rails to the concrete track slab while reducing vibration and noise. It was applied as a grout layer beneath the fastening assemblies, filling the gap between the baseplate and the slab to create a strong bond that locks the system in place. This bedding layer also spreads load and absorbs vibration, helping protect the concrete from cracking and long-term fatigue.

The Megapoxy team worked closely with the contractor and installation crews, supporting precise scheduling, smooth application and consistent results across the build.

Products used

Megapoxy 206 Ultra

Standout benefits

  • Reliable, high-volume supply that supported seamless track installation.
  • Proven performance for a 12km urban light rail network with 16 stops.
  • Strong, consistent bonding that protects concrete from vibration and wear.
  • Easy-to-handle epoxy system suited to repetitive large-scale applications.
  • Trusted Australian-made product with expert local support.

Download PDF