Oak Haven Brewery: Gosford RSL Club

Project name Oak Haven Brewery: Gosford RSL Club
Client Gosford RSL
Contractor Floorgard
Project Manager North Constructions
Location New South Wales
Application Sealing

 

Strength on tap: revitalised brewery flooring and drainage

Client needs + challenges

  • High-temperature resistant, robust and durable floor.
  • Seamless blend between restored and existing flooring.
  • Well-functioning, properly sealed drainage system.
  • Easy-to-clean surface for a busy brewery.
  • Efficient and reliable fix to minimise downtime.

 

Solutions, service + simplicity

We worked closely with North Constructions and Floorgard to simplify the process, guiding the right solutions and application methods for a smooth and successful result.

Preparing surfaces

  • Loose and delaminating epoxy coating was removed from the affected floor area and drain.
  • After removing plastic residue, the drain was ground back to fresh concrete.
  • Remaining affected floor coatings were ground off, up to 200mm from the brewery tanks.
  • Adjacent floor areas were cleaned and abraded for a seamless blend with the restored area.

Drain grate, drain & puddle flange 

  • Concrete around the drain was cut to install a steel grate bracket, which was secured with Megapoxy HT, an epoxy gel adhesive with high temperature and chemical resistance.
  • Soft epoxy around the puddle flange was removed, the area cleaned, and packed with our high-strength paste, Megapoxy P1.
  • The drain interior was primed with Megapoxy H, followed by a high-strength epoxy mortar mix (Megapoxy H and sand) shaped for optimal drainage, and sealed with another Megapoxy H layer.

Final coatings

  • A mix of Megapoxy MC (Part A) and Megapoxy H (Part B) was applied across the drain, affected floor and adjacent concrete, creating a fully sealed, seamless, and durable finish.

 

Standout benefits

  • Stronger, longer-lasting flooring built for brewery conditions.
  • Better drainage to prevent water pooling, damage and safety risks.
  • A level, safe, ridge-free transition between existing and new floor areas.
  • Concrete reinforcement around drains for smooth flow of loaded pallet jacks.
  • Resistant to high temperatures, spills, stains and chemicals.

Easy to clean and low maintenance, saving time and effort.